BMW 3 Series E30

since 1983-1994 release

Repair and operation of the car



BMW E30
+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engine
   + 3.1.2. Specifications
   - 3.2. Dismantle and capital repairs of the engine
      3.2.2. Specifications
      3.2.3. Capital repairs – the general instructions
      3.2.4. Check of a compression in engine cylinders
      3.2.5. Capital repairs – general comments
      3.2.6. Diagnostics of the engine by means of the vacuum gage
      3.2.7. Capital repairs – alternatives
      3.2.8. Dismantle of the power unit
      3.2.9. Removal and installation of the engine
      3.2.10. Order of dismantling of the engine
      3.2.11. Dismantling of a head of the block of cylinders
      3.2.12. Cleaning and check of a head of cylinders and details of the valvate mechanism
      3.2.13. Repair of valves
      3.2.14. Assembly of a head of the block of cylinders
      3.2.15. Removal of pistons and rods
      3.2.16. Dismantle of the crankshaft
      3.2.17. Intermediate shaft (only M20 engine)
      3.2.18. Cleaning of the block of cylinders
      3.2.19. Check of a condition of the block of cylinders
      3.2.20. Honningovaniye of cylinders
      3.2.21. Check of a condition of pistons and rods
      3.2.22. Check of a condition of the crankshaft
      3.2.23. Check of radical and conrod bearings
      3.2.24. Engine assembly order
      3.2.25. Installation of piston rings
      3.2.26. Installation of an intermediate shaft
      3.2.27. Installation of the crankshaft and check of gaps in radical bearings
      3.2.28. Installation of a back epiploon
      3.2.29. Installation of rods and pistons, check of gaps in conrod bearings
      3.2.30. Launch of the engine after repair and a running in
   + 3.3. Engine electric equipment
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. Exhaust system
+ 8. Transmissions
+ 9. Coupling
+ 10. Brake system
+ 11. Running gear
+ 12. Body
+ 13. Electric equipment
+ 14. Useful tips


621199f4



3.2.26. Installation of an intermediate shaft

PERFORMANCE ORDER
1. Clear the basic necks of a shaft and the plug pressed in the block of cylinders.
2. Establish a shaft and tighten 2 bolts of a clamping flange. Further assembly is carried out upside-down.